154HC Mast Section Installation and self-examination of Tower ceiling lifting and turning
Standard requirements for self-inspection of Tower lifting and rotation:
1. A balance valve or hydraulic lock shall be provided and connected to the cylinder with a hard tube.
2. When there is no central collector ring, a rotary limit should be set. The rotating part should be free to rotate in the non-working state. No stopper should be set up.
154HC Mast Section 154HC mast section the specification can suitable this situaton no problem
Получить последнюю цену? Мы ответим как можно скорее (в течение 12 часов)
новости
Продукция
Рекомендуемые товары
Контактная информация